Skip to main content

Filters

Showing 33 - 48 of 86 results
  • Caredig ORP 2.1 and 2.2

    Delivering 50 homes under ORP 2.1 and 30 homes under ORP 2.2

    Caredig ORP 2.1 and 2.2
  • Cynon Tâf Community Housing ORP 2.1

    10 homes under ORP 2.1, utilising Solar PV and Battery storage.

    Cynon Tâf Community Housing ORP 2.1
  • Coastal Housing Group ORP 2.1

    5 homes delivered under ORP 2.1.

    Coastal Housing Group ORP 2.1
  • Carmarthenshire Local Authority ORP 2.1

    16 homes utilising intelligent energy systems, floor insulation, air source heat pumps, solar PV & battery and mechanical ventilation heat recovery.

    Carmarthenshire Local Authority ORP 2.1
  • Cadwyn Housing Association ORP 2.1

    102 homes under ORP 2.1 using a fabric first, whole home assessment approach. The project will utilise intelligent energy systems, solar PV and battery. external wall insulation and replacement windows.

    Cadwyn Housing Association ORP 2.1
  • Bron Afon Community Housing ORP 2.1

    74 homes under ORP 2.1 using fabric first, whole home assessment approach utilising intelligent energy systems, new windows and external wall insulation.

    Bron Afon Community Housing ORP 2.1
  • Adra Housing Association ORP 2.1

    80 homes under ORP 2.1 using a fabric first, whole home assessment approach. The projects will utilise intelligent energy systems, Solar PV, new windows and external wall insulation.

    Adra Housing Association ORP 2.1
  • Glanrafon – Cartrefi Conwy

    An advanced manufacturing facility aiming to transition to a new purpose built facility built to Passive Plus performance standard, using renewable energy to power not only the building but the production equipment.

    Glanrafon – Cartrefi Conwy
  • Gwynfaen Farm – Pobl/Coastal Housing Group

    144 homes will provide local supply chain opportunities to achieve economies of scale for the materials and components necessary to achieve Zero Carbon homes.

    Gwynfaen Farm – Pobl/Coastal Housing Group
  • Eastern High by Cardiff City Council

    Demonstrating how higher density buildings like flats and apartments can be designed and operated to provide greater energy benefits to residents.

    Eastern High by Cardiff City Council
  • Bulwark – Monmouthshire Housing

    Delivered under the IHP, this project transforms blighted places, enhancing the wellbeing of residents and enabling constrained sites to be developed to a density of 30-40 dwellings per hectare

    Bulwark – Monmouthshire Housing
  • Hillview Crescent by Swansea City Council

    Part of the City Deal “Homes as Power  Stations” project. The project will be delivered utilising ground source heat pumps, solar PV with batteries and mechanical ventilation heat recovery.

    Hillview Crescent by Swansea City Council
  • Parc Hadau – Sero Homes

    Parc Hadau includes multiple innovations throughout the scheme.

    Parc Hadau – Sero Homes
  • Vere Street by Linc Cymru Housing Association

    Seven storey main block and four storey secondary block delivered under IHP, featuring vertical sky gardens, vertical greening, bio-solar blue/green roof and integrated SUDS system

    Vere Street by Linc Cymru Housing Association
  • Flexi Homes by First Choice Housing Authority

    This project will allow those with physical disabilities to remain in their homes and live in suitable accommodation when in need.

    Flexi Homes by First Choice Housing Authority
  • Marleyfield House – Flintshire Council

    An exemplar model of how GP’s support residents in Care Homes will be developed and Flintshire County Council are working alongside Betsi Cadwaladr University Health Board (BCUHB) to develop a solution that will ensure that residents receive timely and consistent care from all services, with both social care and health service staff all working together.

    Marleyfield House – Flintshire Council